秘密入口

秘密入口 | Blog | 秘密入口

5 Key Areas for Winter Building Prep | Blog | 秘密入口

Written by 秘密入口 | Oct 24, 2017

Performing regular winter maintenance projects before every winter season yields big long-term savings by protecting your building from weather deterioration, or from unexpected damage.

Right now is the time to request a from FM360. The FM360 team will conduct a thorough inspection of your facility and provide a complete report of the your building鈥檚 winter-readiness.

If any preventive maintenance or repairs are identified, our team can complete the work quickly and affordably鈥攅specially if you鈥檇 rather not distract your maintenance staff with this type of work.

These 5 keys areas will be included in the Winter Building Inspection:

  1. Building exteriors and outer envelope: Check condition of exterior walls.
  2. Building roofs, overhangs, and dock shelters: Check for condition, signs of leakage, sealing integrity of overhangs to main walls, and check for obvious structural support integrity issues of all roof structures.
  3. Windows, doors, and other exterior building openings: Check for air gaps and leaks and indicate areas needing caulking, weather stripping, or repair.
  4. Loading dock: Perform heat loss evaluation caused by air gaps and use of obsolete, stay-open sliding steel overhead doors; compare savings gained by upgrading to energy saving fast-opening doors.
  5. Parking lots and access roads: Check condition and advise if preventive asphalt maintenance is needed.

贵惭360鈥檚 could help identify problem areas before the winter takes its toll. And completing necessary repairs now could save thousands of dollars this winter in lower heating bills.

Make sure your facility is 鈥渂uttoned up鈥 for the winter ahead: and we will conduct a thorough winter checkup at your facility.

For more information about FM360:

  • of the FM360 program