Avoiding the Risks of Construction Design Flaws
Avoiding the Risks of Construction Design Flaws The earliest stages of a conventional design/bid/build (D/B/B)...
Delays are a common occurrence with the typical design-bid-build (D/B/B) construction delivery process. Nearly every step of D/B/B presents another potential for a slowdown or postponement of your project, costing you valuable time and money.
Awareness of these potential delays is half the battle. Once you understand the delays inherent in traditional D/B/B construction, finding a productive alternative becomes that much easier.
for an in-depth look at the ways the D/B/B delivery method can be detrimental to your project, and learn about an alternative construction approach that eliminates these liabilities.
For more information about the most timely and cost-effective delivery method for your next process manufacturing construction project, contact Brandon Gartee at 419.720.2677 or Brandon.Gartee@RLGbuilds.com.
Avoiding the Risks of Construction Design Flaws The earliest stages of a conventional design/bid/build (D/B/B)...
It pays to compare. The traditional or D/B/B approach to construction projects, in a process-driven environment, can...
Industrial Manufacturers Should be on the Lookout for These Common Construction Pitfalls The Design-Bid-Build (D/B/B)...